12
edits
Changes
initiatial text
Is the ability to withstand and to endure a shortfall of supply of gas. The minimum amount of time a country has to currently withstand is set with 30 days.
A stress test conducted in 2014 conducted by the European Commission uncovered several shortcomings in that regard. As a consequence, the proposal 0030/2016 was initiated.
[[Category:Warsaw:ITRE II]]
A stress test conducted in 2014 conducted by the European Commission uncovered several shortcomings in that regard. As a consequence, the proposal 0030/2016 was initiated.
[[Category:Warsaw:ITRE II]]